ABS Core v4.3.3
Investor Track

Investor Roadmap 2030

Capital requirements, milestones, and market opportunity for ABS Core's path to Pentagon-grade AI governance. Architecture is complete. What remains is certification and market entry.

Investor Roadmap: Path to Pentagon & 2030 Leadership

The Situation (2026)

The engineering is done. ABS Core v4.5.0 has a verified architecture score of 10/10 — every technical capability required for DoD IL4 and NSS compliance is implemented and tested.

What separates ABS Core from a defense contract is not technology. It is process and capital:

  • FIPS 140-3 CMVP certificate (18 months, USD 150k)
  • Common Criteria EAL4+ (36 months, USD 1.8M)
  • Authorization to Operate (ATO) from a DoD Authorizing Official
  • Personnel security clearances
  • Federal BD infrastructure

The Claude Mythos disclosure (April 2026) validated the market thesis: organizations deploying frontier AI models have no governance layer adequate for the threat. ABS Core is the answer.


Round A: USD 8M — IL2 ATO + First Contract

Timeline: 18 months | Target ARR at milestone: USD 3M

Use of FundsAmount
FIPS 140-3 CMVP validationUSD 150k
ISSO + RMF documentation + ATO legalUSD 200k
Penetration test (credentialed, SAR-ready)USD 35k
System integrator partnership (Booz Allen / SAIC)USD 200k
Personnel (CISO, Federal Sales Lead, Solutions Architect)USD 1.2M
Federal BD infrastructure (DCSA, SAM.gov, clearances)USD 345k
Operating capital (18 months)USD 5.87M
TotalUSD 8M

Outcome: IL2 ATO + access to USD 2.4B NIPRNET AI governance market.


Round B: USD 25M — IL4 ATO + NSA APL

Timeline: 36 months | Target ARR at milestone: USD 28M

Use of FundsAmount
Common Criteria EAL4+ evaluationUSD 1.8M
TS/SCI cleared engineering teamUSD 3M
HSM fleet (Thales Luna 7, hardware root of trust)USD 350k
SPIFFE/SPIRE workload identityUSD 200k
Quantum-safe hardware acceleration (PQC HSM)USD 500k
Federal BD expansion (DHS, DoE, IC)USD 1.5M
Operating capital (24 months)USD 17.65M
TotalUSD 25M

Outcome: IL4 ATO + NSA NIAP APL listing + access to USD 48B NSS market.


Round C: USD 80M — Full-Spectrum Defense + International

Timeline: 60 months | Target ARR at milestone: USD 240M

International expansion (Five Eyes), IL6 facility, Cross Domain Solution, full CNSA 2.0 compliance fleet.


Competitive Moat

By Round B close, ABS Core will have:

  1. FIPS 140-3 CMVP certificate — 18 months lead over any competitor who starts today
  2. Common Criteria EAL4+ — 36 months lead
  3. IL4 ATO — cannot be accelerated with money alone (process requires time)
  4. Post-Quantum Cryptography (ML-DSA-65) — operational while competitors plan
  5. Volt Typhoon / APT detection — 42 patterns, MITRE ATT&CK aligned

The moat compounds: every month of delay for a competitor is a month they are not on DoD contract vehicles.


Technical Proof

All claims are verifiable in the public repository. For due diligence access:

  • IMPLEMENTATION_LOG.md — complete log of 12,000+ lines of code implemented
  • security/rmf/SYSTEM_SECURITY_PLAN.md — draft SSP ready for AO submission
  • 55 automated tests — run make test to verify
  • Architecture audit report available upon NDA execution

Contact: [email protected] | [email protected]

On this page